Stainless Steel Welded Frame Assemblies for Industrial Equipment

Stainless Steel Welded Frame Assemblies for Industrial Equipment2026-05-28T14:00:13+00:00

Stainless Steel Welded Frame Assemblies for Industrial Equipment

Material: SS304 / SS316L Process: TIG Welding + Fabrication Industry: Industrial Equipment

Custom TIG-welded frames, machine bases, equipment enclosures, and support structures — built from SS304/SS316L to your exact drawings. Full penetration welds. Dimensional accuracy down to ±0.5 mm. Components are finished and ready for direct assembly line integration.

Why Industrial OEMs Choose Conwhole

CapabilityDetail
🔩 Certified TIG WeldingOur welders are all certified to the ISO 15614 standard. All welds meet the requirements for full penetration, porosity is kept within industry-accepted limits, and the appearance of the welds on all joints is consistent.
📐 Precision JiggingCustom fixtures ensure consistent frame geometry. Even in complex multi-joint assemblies, overall dimensional tolerances can be maintained within ±0.5 mm.
⚙️ Integrated Post-Weld ProcessingWe offer full-process surface treatment services including grinding, passivation, electrolytic polishing and powder coating. Our one-stop solution saves you the trouble of working with third-party suppliers.
📏 Batch Quality ControlEvery production batch begins with a comprehensive dimensional inspection of the first unit. We conduct welding inspections throughout the production process and provide a detailed final quality report.

Product Specifications

ParameterSpecification
Material GradesSS304, SS304L, SS316, SS316L
Material FormsSheet, plate, tube, pipe, channel, angle
Welding ProcessTIG (GTAW) — standard; MIG (GMAW) for thicker sections
Weld QualityFull penetration, porosity-free per AWS D1.6
Dimensional ToleranceControlled in accordance with customer drawings
Max Assembly Size4,000 x 2,000 x 1,500 mm (larger on request)
Surface FinishMill, brushed (#4), electropolished, powder-coated (custom RAL)
Post-Weld TreatmentGrinding, passivation, glass-bead blasting, chemical cleaning
MOQ10 pcs (prototype: 1–5 pcs)
Lead Time20–25 working days (sample: 7–10 days)
CertificationsMaterial test certificates, WPS available

Applications

  • Machine Bases & Equipment Frames — Welded bases for packaging machinery, conveyors, assembly lines, and robot workstations.
  • Food Processing & Pharmaceutical — Stainless framing for hygienic conveyors, cleanroom equipment stands, and sterile processing racks.
  • Material Handling — Heavy-duty pallet frames, transport fixtures, lift-table bases, and scissor-lift assemblies.
  • Commercial Kitchen — Frame assemblies for cooking lines, prep stations, shelving units, and ventilation hoods.

Frequently Asked Questions

What welding standard do you follow?
Our welding procedures comply with AWS D1.6 (Stainless Steel) and ISO 15614. We can provide WPS and welder qualification records upon request.

Can you weld stainless steel to carbon steel?
Yes. Using appropriate filler metals, we can join stainless steel to carbon steel assemblies. Contact us with your specific material combination.

How do you control distortion on large frames?
We use sequenced welding techniques, fixturing to restrain movement, and stress-relief measures where needed. For high-precision frames, post-weld machining is available.

Do you offer assembly of components onto the frame?
Yes. We can integrate brackets, hinges, mounting plates, casters, and hardware before shipping — reducing your final assembly time.

What finish do you recommend for food-grade applications?
For food processing and pharmaceutical use, electropolishing or #4 brushed finish provides a smooth, non-porous surface that meets hygienic standards.

Custom Manufacturing Details

All products are manufactured to your drawings or samples. DFM optimization available at no extra charge. Sample available before mass production. OEM/ODM accepted. We can integrate secondary operations — drilling, tapping, countersinking, and hardware insertion — to deliver frames that are ready for your production line.

stainless steel welded custom parts industrial equipment application
Lead Time: 20–25 Working Days
Sample: 7–10 Days
MOQ: 10 pcs (Prototype: 1–5)
OEM / ODM Accepted
DFM Support Included

Build Your Next Equipment Frame with Conwhole

Send us your drawing or dimensional sketch. We will review, suggest the optimal weld approach, and return a firm quote — typically within 24 hours.

Go to Top