Stainless Steel Welded Frame Assemblies for Industrial Equipment

Stainless Steel Welded Frame Assemblies for Industrial Equipment2026-05-27T14:10:51+00:00

Stainless Steel Welded Frame Assemblies for Industrial Equipment

Material: SS304 / SS316L Process: TIG Welding + Fabrication Industry: Industrial Equipment

Custom TIG-welded frames, machine bases, equipment enclosures, and support structures — built from SS304/SS316L to your exact drawings. Full penetration welds, ±0.5 mm dimensional accuracy, and finished ready for assembly-line integration.

Why Industrial OEMs Choose Conwhole

Capability Detail
🔩 Certified TIG Welding Welders qualified to AWS D1.6 / ISO 15614. Full penetration, no porosity, consistent bead appearance.
📐 Precision Jigging Custom jigs ensure repeatable frame geometry — ±0.5 mm on overall dimensions, even for complex multi-joint assemblies.
⚙️ Integrated Post-Weld Processing Grinding, passivation, electropolishing, powder coating — all in-house. No back-and-forth between vendors.
📏 Batch Quality Control First-article inspection on every new order. In-process weld checks and final dimensional report included.

Product Specifications

Parameter Specification
Material Grades SS304, SS304L, SS316, SS316L
Material Forms Sheet, plate, tube, pipe, channel, angle
Welding Process TIG (GTAW) — standard; MIG (GMAW) for thicker sections
Weld Quality Full penetration, porosity-free per AWS D1.6
Dimensional Tolerance ±0.5 mm on overall dimensions
Max Assembly Size 4,000 x 2,000 x 1,500 mm (larger on request)
Surface Finish Mill, brushed (#4), electropolished, powder-coated (custom RAL)
Post-Weld Treatment Grinding, passivation, glass-bead blasting, chemical cleaning
MOQ 10 pcs (prototype: 1–5 pcs)
Lead Time 20–25 working days (sample: 7–10 days)
Certifications Material test certificates, WPS available

Applications

  • Machine Bases & Equipment Frames — Welded bases for packaging machinery, conveyors, assembly lines, and robot workstations.
  • Food Processing & Pharmaceutical — Stainless framing for hygienic conveyors, cleanroom equipment stands, and sterile processing racks.
  • Material Handling — Heavy-duty pallet frames, transport fixtures, lift-table bases, and scissor-lift assemblies.
  • Commercial Kitchen — Frame assemblies for cooking lines, prep stations, shelving units, and ventilation hoods.

Frequently Asked Questions

What welding standard do you follow?
Our welding procedures comply with AWS D1.6 (Stainless Steel) and ISO 15614. We can provide WPS and welder qualification records upon request.

Can you weld stainless steel to carbon steel?
Yes. Using appropriate filler metals, we can join stainless steel to carbon steel assemblies. Contact us with your specific material combination.

How do you control distortion on large frames?
We use sequenced welding techniques, fixturing to restrain movement, and stress-relief measures where needed. For high-precision frames, post-weld machining is available.

Do you offer assembly of components onto the frame?
Yes. We can integrate brackets, hinges, mounting plates, casters, and hardware before shipping — reducing your final assembly time.

What finish do you recommend for food-grade applications?
For food processing and pharmaceutical use, electropolishing or #4 brushed finish provides a smooth, non-porous surface that meets hygienic standards.

Custom Manufacturing Details

All products are manufactured to your drawings or samples. DFM optimization available at no extra charge. Sample available before mass production. OEM/ODM accepted. We can integrate secondary operations — drilling, tapping, countersinking, and hardware insertion — to deliver frames that are ready for your production line.

Product Image
?? Stainless Steel Welded Frame
Product photo to be uploaded
Lead Time: 20–25 Working Days
Sample: 7–10 Days
MOQ: 10 pcs (Prototype: 1–5)
OEM / ODM Accepted
DFM Support Included

Build Your Next Equipment Frame with Conwhole

Send us your drawing or dimensional sketch. We will review, suggest the optimal weld approach, and return a firm quote — typically within 24 hours.

Go to Top